What problems do we solve
- Transportation moves against the established direction
- Security has to physically stop the violator
- No backup means after passing the first line
- The system is dangerous without proper labeling and logic
CONTROL ТРАНСПОРТА
Steerable and one-way spike barriers for direction control and forced stop. Design, supply, installation, and maintenance in Almaty and across Kazakhstan
SHORT ANSWER
The spike system addresses a specific scenario for controlling wheeled transport. Its placement requires clear signaling, a safe distance, and coordination with gates and the security post.
QUESTIONS AND ANSWERS
Short answers to questions that affect the composition, cost, and reliability of the solution.
Only possible with clear traffic organization, warnings, speed limits, and management regulations. The specific scheme is determined after inspection.
The budget is influenced by the size and condition of the facility, the required level of protection, the components of automation, construction work, integration, logistics, and service. Therefore, an accurate price is formed after the initial data, and for a complex facility—after an inspection.
It is enough to indicate the city, purpose of the facility, dimensions or zone plan, current problem, desired outcome, and deadlines. Photos, a diagram of existing systems, and the operating mode will help prepare a detailed proposal more quickly.
Yes, KRONIS GROUP operates throughout Kazakhstan. The format of the first stage—remote analysis or on-site visit—depends on the region, complexity, and completeness of initial data.
Often it is possible. Before the project, we check interfaces, protocols, power, network, controllers, software, and the actual state of the equipment. Incompatible sections are marked before procurement.
We record the initial assumptions, equipment and work composition, boundaries of responsibility, deadlines, exclusions, and possible service. This allows comparing options by outcome, not just by the price of individual devices.
The term and conditions of the warranty depend on the manufacturer, equipment, and scope of work. Specific obligations, procedures for claims, and exclusions are stated in the contract before delivery; post-warranty service is agreed upon separately.
ENGINEERING CONSULTATION
Describe what needs to be protected, automated, or powered. We will ask precise questions and suggest the next engineering step.