What problems do we solve
- Too many false alarms
- Dead zones and unstable sensitivity
- Equipment interferes with evacuation and flow
- Staff does not understand the procedure for secondary inspection
CONTROL ЛЮДЕЙ
Selection of sensitivity and detection zones for the flow, regulations and conditions of entry. Design, supply, installation, and maintenance in Almaty and across Kazakhstan
SHORT ANSWER
A good metal detector should detect specified items with an acceptable number of false alarms. The result depends on the installation location, interference, sensitivity settings and re-inspection regulations.
QUESTIONS AND ANSWERS
Short answers to questions that affect the composition, cost, and reliability of the solution.
Depends on localization accuracy, stream, and budget. The number of zones by itself does not guarantee quality without correct setup and placement.
The budget is influenced by the size and condition of the facility, the required level of protection, the components of automation, construction work, integration, logistics, and service. Therefore, an accurate price is formed after the initial data, and for a complex facility—after an inspection.
It is enough to indicate the city, purpose of the facility, dimensions or zone plan, current problem, desired outcome, and deadlines. Photos, a diagram of existing systems, and the operating mode will help prepare a detailed proposal more quickly.
Yes, KRONIS GROUP operates throughout Kazakhstan. The format of the first stage—remote analysis or on-site visit—depends on the region, complexity, and completeness of initial data.
Often it is possible. Before the project, we check interfaces, protocols, power, network, controllers, software, and the actual state of the equipment. Incompatible sections are marked before procurement.
We record the initial assumptions, equipment and work composition, boundaries of responsibility, deadlines, exclusions, and possible service. This allows comparing options by outcome, not just by the price of individual devices.
The term and conditions of the warranty depend on the manufacturer, equipment, and scope of work. Specific obligations, procedures for claims, and exclusions are stated in the contract before delivery; post-warranty service is agreed upon separately.
ENGINEERING CONSULTATION
Describe what needs to be protected, automated, or powered. We will ask precise questions and suggest the next engineering step.