FIND LOSSES BEFORE THE ANNUAL REPORT

Maintenance and diagnostics of solar power plants

Monitoring of operation, errors, connections, protection, mountings, inverters, and batteries.

MAIN RESULT

Service compares actual operation with expected performance, not just a visual inspection. Deviations are localized to the panel, row, inverter, network, or consumption mode.

PRACTICAL SCENARIO

How the solution helps in a real-world situation

The main station continues to operate, but one line produces less. Monitoring detects deviation, diagnostics find the cause, and the loss is eliminated before it accumulates over the season.

WHERE THE RESULT IS LOST

The problem is rarely located in a single device

We check the project, installation, settings, power, data, and maintenance as a single chain.

01

The fault is invisible because the inverter has not stopped completely

02

Panels are cleaned according to the schedule without checking the result

03

Inverter errors are reset without finding the cause

04

Battery status is assessed only by charge percentage

SCOPE OF WORK

What we design and inspect

Work boundaries and acceptance criteria are recorded before equipment purchase

  1. 01

    Comparing plan and actual by period

  2. 02

    We check logs, lines, protection, and connections

  3. 03

    Inspecting structures and cable routes

  4. 04

    Testing batteries and updating the service report

HANDOVER TO THE CLIENT

What remains with the owner of the system

BEFORE ORDER

Questions: ses service

Short answers to questions that affect the composition, cost, and reliability of the solution.

01How to understand that the station generates less than the norm?

We compare data with the calculation model, weather, neighboring strings, and past periods. A single daily chart without context does not show the reason.

02How often should I wash the panels?

According to contamination, installation angle, precipitation, and measurable output drop. Unnecessary washing increases costs and the risk of damage.

03Are you servicing another installer's stations?

Yes, after an incoming audit, schema repair, and availability check for documentation and compatible components.

04What is tested at an inverter?

Errors, temperature conditions, line and network parameters, communication, ventilation, updates according to the manufacturer's regulations and actual efficiency.

05How are batteries diagnosed?

According to BMS logs, voltages, temperature, imbalance, available energy, and load test. The percentage in the app alone is insufficient.

06Can automated notifications be configured?

Yes, if the platform supports notifications. We configure events, recipients, and the response procedure so that errors are not lost among informational messages.

ENGINEERING CONSULTATION

Let's discuss: ses service

Send the city, facility purpose, photos or plan and the current problem. Let's determine the initial data for a accurate proposal.

WhatsApp will open with a prepared request. The message will be sent only after you confirm it.